Chain Link in Saddle River, NJ: Front Building Lines and the Slat Ban
Before ordering chain link in Saddle River, decide where the enclosure belongs and whether you need open visibility or screening. The Borough restricts the material in front of a principal building and expressly prohibits privacy slats. Start with fence installation in Saddle River and mark the proposed line on your survey.

What Saddle River allows—and where chain link stops
The specific material rule is §105-4B, Permitted fences. It prohibits slats on chain-link fences and bars chain link of any kind in front of a principal building beyond the front building line. A black coating does not remove that restriction. Have the Borough identify the front building line on the proposal before specifying a street-facing run.
For required front, side and rear yards, §105-4A gives a general six-foot fence ceiling, with a three-foot ceiling for solid construction. Section 105-2 classifies fences with less than fifty percent open space as solid. Those general rules do not override the chain-link restrictions. Confirm the height and location for each segment rather than copying a neighboring fence.
Need privacy? Change the proposal before ordering
Privacy slats conflict with Saddle River’s express prohibition. If screening is your main goal, ask about a different permitted material and location during zoning review. Do not order bare mesh with a plan to insert slats later.
Bring a sketch showing the area you want screened, the direction of the view and any existing planting. An approved alternative should be reflected in the estimate and municipal submission. Our chain-link fence installation page explains the material; local rules determine which proposed uses are permissible.
Write a complete mesh and gate specification
Ask for mesh opening, wire specification, coating, posts, rails, fittings and gate hardware in writing. Identify the clear gate opening needed for a mower or equipment. Record the proposed bottom clearance along changes in grade, particularly if the enclosure is intended to contain a pet. The quote should state old-fence removal and restoration scope as well as installation footage.
Separate ordinary yard fencing from special enclosures. Section 105-4F addresses recreational courts, and G addresses animal runs with their own screening conditions. A pool barrier also needs its applicable construction-code review. The court shown in the photograph demonstrates the material, not a height to copy for a residential boundary.
Prepare the application before setting an installation date
Use the Borough’s official fence-permit filing instructions to confirm the current application, plot plan, zoning and UCC requirements. Include nearby streets, the building footprint, fence heights and all gates. Ask the reviewer to identify any visibility, easement or special-use conditions affecting the chosen line.
Our four-step fence installation process
1. Share your project: request a free estimate with the address, intended use and any survey or plans you already have.
2. Review the design: compare materials, fence position and gate access, then confirm the required municipal approvals for the proposed work.
3. Prepare and install: coordinate the approved scope, access and installation details with the Tico Fence team before work begins.
4. Walk through the finished work: review the completed fence and gate operation, then discuss the care information for the specified materials.
Get an estimate for the permitted layout
Bring your survey, property photos and the Borough’s response so the estimate describes the same enclosure you intend to submit. Browse actual Tico Fence projects or request a Saddle River fence estimate.
Municipal provisions reviewed November 22, 2026: Chapter 105, particularly §§105-2 and 105-4A, B, F and G. General allowances do not approve a specific property. Confirm current applications, amendments and the Borough’s determination before purchasing materials.